icon-phone 619.235.0961    icon-email Email

When Downtime Is Not An Option.

News

News

PCE: USNS Yukon

Propulsion Controls Engineering, San Diego has been awarded a $317,466 fixed price contract for the USNS YUKON (T-AO 202) Voyage Repair for Military Sealift Command (MSC). The Yukon, the sixteenth ship of the Henry J. Kaiser class, was laid down at Avondale Shipyard, Inc., at New Orleans, Louisiana, on 13 May 1991 and launched on 6 February 1993.

She entered non-commissioned U.S. Navy service under the control of the Military Sealift Command with a primarily civilian crew on 25 March 1994. She serves in the United States Pacific Fleet. The work package includes Winch and FAS Station motor repairs, No. 2 Evaporator piping repairs, replacement of 250 feet of Oily Waste Piping and providing a 12 man ‘Tiger Team’ to support the ships on going maintenance. Work is to be performed in San Diego, CA and is expected to be completed by June 2011.

  1. Make Contact
Please enter a name.
Please enter a valid email address.
Please enter a valid phone number.
Invalid Input
Invalid Input
I Would Like More Information About:



Invalid Input
Send me your newsletter:

Invalid Input

Our Guarantee

At PCE, we pledge to provide you with the highest level of integrity and expertise; to recommend only what’s good for you and your situation; to use all resources possible to minimize downtime; to give the best value for your dollar; and to stand by our work and our word.

Contact Us

California
Corporate Headquarters
1620 Rigel Street
San Diego, CA 92113
Phone: (619) 235-0961
Fax: (619) 233-5096 
California
Diesel & Motor Division
3376 Main Street
San Diego, CA 92113
Phone: (619) 235-0961
Fax: (619) 687-0038 
Hawaii
99-1221 Halawa Valley Street
Aiea, HI 96701-3281
Phone: (808) 486-6600
Fax: (808) 845-1652 
Washington
920 West Marine View Drive
Everett, WA 98201-1300
Phone: (425) 257-9065
Fax: (425) 259-6851